|
|
Research on the BIM Team-based Learning Framework Based on Result Chain Model |
Zhang Jingxiao1,Cui Fan2 |
1.School of Economic and Management, Chang'an University;2.School of Civil Engineering, Chang'an University, Xi'an 710061,China |
|
|
Abstract In order to solve the problem of performance management of BIM team learning based on development result, this research applies the result chain model to the project management BIM team learning planning and execution process. This study defines the specific content of BIM in the process of team learning chain, and according to ABET's cognitive evaluation criterion, proposed the BIM Bloom team learning table analysis of cognitive level, gives the BIM implementation phase of the implementation phase of team learning relationship table ,and formed a complete set of results to the development oriented BIM team-based learning plan ,implementation, evaluation and feedback system. The case research shows that has great influence to improve the input stage technology, participants, time and stage of team work, training courses to the students' BIM ability, and the cost and use of multimedia means of ability training has little effect.
|
Received: 01 April 2017
|
|
Corresponding Authors:
Zhang Jingxiao
|
|
|
|
[1]《2016—2020年建筑业信息化发展纲要》发布[J].建设科技,2016(18):4.
[2]张静晓,李慧,翟颖,等.工程管理BIM教育课程建设与融合分析[J].工程管理学报,2016(3):153-158.
[3]JINGXIAO ZHANG,HAIYAN XIE,HUI LI.Exploring the structure and quality elements of the undergraduate BIM education in civil engineering and managemen[J].International journal of Engineering Education,2016,32(4):1-12.
[4]张静晓,赵陈影,李慧,等.工程管理BIM毕业设计组织管理框架与案例分析[J].工程管理学报,2017(2):1-5.
[5]张龙,李十泉.BIM在土木工程制图课程中的应用[J].山西建筑,2015(29):254-256.
[6]郝丽.BIM技术融入高校工程类专业教学的应用研究[J].土木建筑工程信息技术,2015,7(4):108-111.
[7]JINGXIAO ZHANG,KLAUS SCHMIDT,HUI LI.BIM and sustainability education:incorporating instructional needs into curriculum planning in CEM programs accredited by ACCE[J].Sustainability,2016,8(6):525-555.
[8]克里斯托弗 帕韦尔科,阿兰 D 切西.当今大学本科课程中的BIM课程[J].建筑创作,2012,18(12):20-29.
[9]张雪,陈三波.将BIM 技术融入工程管理专业课程的思考[J].河南科技,2013(17):269-280.
[10]李雪,马小军,刘建峰.美国BIM教育及虚拟设计与施工课程设置概况[J].现代建筑电气,2013,4(12):1-5.
[11]ERNIEL B BARRIOS.Access to rural development:household perceptions on rural development[M].ADB Institute,2007.
[12]何永浪,吴宗法.发展结果导向的公共项目绩效管理理念[J].当代经济管理,2009,31(1):52-54.
[13]周益众,曹晓红,杨兰馥等.基于结果链框架模型的医疗机构执业监管评估体系构建刍议[J].中国卫生监督杂志,2014,21(4):317-320.
[14]米小珍,刘晓冰,臧传真.基于结果链的建模方法在企业分析和系统设计中的研究与应用[J].机械工程学报,2003,39(7):7-12.
[15]吴宗法,张文洁,夏闻一.发展结果导向的公共项目评价方法-以燕山水库为例[J].水利建设与管理,2012(3):76-79.
[16]崔东红,王莹,么艳.基于结果链与结果管理的房地产项目管理[J].沈阳工业大学学报:社会科学版,2008(3):235-238.
[17]吴宗法,马振鹏,孟秀焕.基于模糊神经网络的公共项目绩效评价模型研究——以发展结果为导向的理论框架构建[J].南京审计学院学报,2015(1):85-94.
|
[1] |
. [J]. SCIENCE & TECHNOLOGY PROGRESS AND POLICY, 2015, 32(22): 88-92. |
|
|
|
|