The Improvement of Cooperation of Project Participants in BIM Context |
Ma Hui,Wang Yunlong |
College of Economics and Management, Tianjin Chengjian University, Tianjin 300380, China |
|
|
Abstract The influence factors of the construction project of all parties involved in the relationship quality, establish impact relationship to improve the quality of engineering project in BIM context, through a questionnaire survey to a project done by enterprise in Tianjin city are analyzed and constructed a fuzzy cognitive map model, using factor analysis model to revise the results. That "information sharing" and "member's ability" and "benefit distribution mechanism" to enhance cooperation plays a key role, and "opportunistic" and "traditional thinking transformation" is the main factors hindering cooperation.
|
Received: 01 April 2017
|
|
Corresponding Authors:
Ma Hui
|
|
|
|
[1]American Institute of Architects. IPD for public and private owners[Z]. 2010.
[2]RAHMAN M M, KUMARASWAMY M M. Contracting relationship trends and transitions[J].Journal of Management in Engineering, 2004, 20(4): 147-161.
[3]徐韫玺,王要武,姚兵.基于BIM的建设项目IPD协同管理研究[J]. 土木工程学报,2011,44(12):138-143.
[4]DOSSICK C S, G NEFF, H HOMAYOUNI. The realities of building information modeling for collaboration in the aec industry, in building a sustainable future-proceedings of the 2009 construction research congress[A]. 2009.
[5]HOWARD MCKEW. Integrated-project delivery[J]. Journal of Engineered Systems,2009,26(1): 108-118.
[6]MIN H, ZHOU G. Supply chain modeling: past present and future[J].Computers & Industrial Engineering,2002,43(11):231-249.
[7]The American Institute of Architects(AIA). Integrated project delivery: a guide[M].Washington : American Institute of Architects,2007.
[8]李红.基于BIM技术的IPD模式研究[D].南京:南京林业大学,2015.
[9]张校伟.基于综合项目交付的进度管理优化设计研究[D].武汉:华中科技大学,2012.
[10]GOFFEE R, JONES G. What holds the modern company together[J].Harvard Business Review,1996,74(6):133-148.
[11]K KANE, K MONTGOMERY. A framework for understanding dysempowerment in organizations[J].Human Resource Management,1998,37(3):263-275.
[12]MAYER R C, DAVIS J H, SCHOORMAN F D. An integrative model of organizational trust[J].Academy of Management Review,1995,20(3): 709-734.
[13]吕文学,张磊,毕星.基于模糊认知图的工程项目争端处理决策研究[J].中国软科学,2014(10):165-173.
[14]任远谋.BIM在我国建筑行业应用影响因素研究[D].重庆:重庆大学,2016.
[15]高源.基于模糊认知图的IPD项目管理团队内部信任评价[D].天津:天津大学,2012.
[16]杨丽.基于模糊认知图的IPD项目谈判模型研究.[D].天津:天津大学,2013.
[17]KOSKO B. Fuzzy cognitive maps[J]. International Journal of Man-Machine Studies,1986,24(1):65-75.
[18]XUE X , SHEN Q , JI Y, et al. Cognition driven framework for improving collaborative working in construction projects: negotiation perspective[J]. Journal of Business Economics and Management, 2010(2):227-242.
[19]苏超,张红,梁迅.基于模糊认知图的生态风险管理研究[J].生态学报,2014,34(20):5993-6001.
|
|
|
|