Multi-objective Trade-off of Green Construction Management under Nonlinear Relation |
Yuan Jianbo1,2,Mao Hongri1,Dai Kunyang1 |
1.School of Traffic and Transportation Engineering, Changsha University of Science & Technology, Changsha 410004, China;2.Chengnan College,Changsha University of Science & Technology,Changsha 410076, China |
|
|
Abstract Except the duration, the cost and the quality of the three goals, the green construction also consider the environmental impact and the social impact. A more comprehensive and complex target management system is formed. This paper analyzed the non-linear relationship between the comprehensive cost, quality, environmental protection level, safety index and duration of green construction management. And based on the multi-attribute utility function theory and the optimization theory, a multi - objective trade - off model of green construction management under nonlinear relation is constructed. Using the genetic algorithm to solve, the most satisfactory solution are the target control requirements of the green construction management. The rationality of the model is demonstrated by an example. And the dilemma of realizing green construction management is discussed.
|
Received: 01 April 2017
|
|
Corresponding Authors:
Yuan Jianbo
|
|
|
|
[1]王建波,葛娟,赵辉.绿色工程项目管理成效的多层次灰色评价[J].土木工程与管理学报,2013(2):85-89.
[2]李小中.绿色管理:企业管理新概念[J].现代管理科学,2001(2):52-54.
[3]GLM AUGENBROE,AR PEARCE. Sustainable construction in the USA: perspective to the year 2010[C]. Sustainable development and the future of construction, 1998:225.
[4]张连营,岳岩.工期—成本—质量的模糊均衡优化及其Pareto解[J].同济大学学报:自然科学版,2013(2):303-308,316.
[5]AZARON A,MOGHADDAM R T. Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach[J].European Journal of Operational Research,2007,180 (3):1186-1200.
[6]TAREGHIAN H R,TAHERI H.An application of randomized mini-mum cut to the project time/cost tradeoff problem[J].Applied Mathematics and Computation,2006,173(2):1200-1207.
[7]GHODSI R,SKANDARI M R,ALLAHVERDILOO M,et al.A new practical model to trade-off time,cost,and quality of a project[J].Australian Journal of Basic and Applied Sciences,2009,3(4):3741-3756.
[8]KHALED EL-RAYES,AMR KANDIL.Time-cost-quality trade-off analysis for highway construction[J]. Journal of Construction Engineering and Management,2005,131(4): 477-486.
[9]ZHU XISHENG, WANG RONG. Reasons why construction firms are reluctant to adopt green construction[J]. Journal of Engineering Management, 2012(2):105-108.
[10]王宇静,李永奎.工程项目绿色施工管理多目标均衡优化研究[J].计算机工程与应用,2010(10):7-10.
[11]尹齐心,余明晖,刘振元.非线性关系下的工程项目工期—成本—质量综合优化[J].计算机应用研究,2011(2):580-583.
[12]建设部.绿色施工导则[J].施工技术,2007(11):1-5.
[13]张连营,严飞,杨瑞.工程项目工期—成本—安全水平均衡优化研究[J].计算机应用研究,2013(1):78-81.
[14]CAPUTO A C,PELAGAGGE P M,PALUMBO M. Economic optimization of industrial safety measures using genetic algorithms[J].Journal of Loss Prevention in the Process Industries,2011,24(5):541-551.
[15]J YUDELSON. The green building revolution[J]. Heating/Piping/Air Conditioning Engineering, 2008,80(1):8-10.
|
|
|
|